Qinghai Province Haixi Prefecture 3# photovoltaic power station project of the photovoltaic area EPhilippines Sugar daddy quoraPC general contracting from the head bidding
requestId:6861492cdd64f1.06848444.
On July 20, the EPC general contracting (from the bidding) photovoltaic zone EPC in Haixi Prefecture, Qinghai Province was issued. The bidding notice showed that this project is a Qinghai Haizhou 3# photovoltaic station project with a total capacity of 100MW (DC side), and a traffic side installation capacity of 81.25MW.
Qinghai Province Haixi Prefecture 3# photovoltaic power station project EPC general contracting (from bidding) bidding notice
(Tender number: CGN-202105130006-N1)
Tender project location area: Qinghai Province, Haixi Mongolian Hidden Autonomous Prefecture, Geermu City
1. Tender conditions
This project is the general contracting of the EPC photovoltaic area in the 3# block photovoltaic power station project of Haixi Prefecture, Qinghai Province (from bidding) (Tender project number: CGN-20210513000Sugar baby6-N1), has been approved by the project review/approval/preparation agency. The project funds are from the company and have been implemented. The bidder is China Guang Nuclear Qinghai Lenghu Winli Power Co., Ltd. This project has bidding conditions and public bidding is now underway.
2. Project overview, bidding scope and planning period
Project size:
Qinghai Provincial Dynamics Bureau has built development goals based on the “Qinghai Renewable Dynamics Demonstration Zone” and combined with the Internet’s consumption capacity, and has initially proposed to add 2 million kilowatts of photovoltaic competition installation and installation projects in 2020 that require national financial supplement. According to the 2020 popular photovoltaic power station project in Qinghai Province, the 2 million kilowatt projects are located in Tara Beach, Gonghe County, Hainan Prefecture and Utumiren, Ulmu City, Germu City. Among them: 1.6 million kilowatt photovoltaic stations were set up in Taraba, Gonghe County, Hainan Prefecture, which were divided into 16 blocks, with a planned installation capacity of 100MW in GerSugar babyMushi U Tumeiren has a 400,000 kW photovoltaic station, which is divided into 4 blocks, with a planned installation capacity of 100MW for each block.
This project is a photovoltaic station project in Haixi Prefecture, Qinghai Province, with a total installation capacity of 100MW (DC side) and a transportation side installation capacity of 81.25MW. This project is a 2020-3# block in Haixi Prefecture, Qinghai Province, <a The center of the site is E93°20′44", N36°46′30", and the altitude is between 2963m and 2983m. The total airspace is 1.77km2. The site area is unused land in the country, and importantly it is wasteland. There is a provincial highway of S303 about 14km to the north of the site. It can be connected to the parkland planning road Sugar. babyS303 Provincial Highway to the venue is more convenient for international communication conditions.
Pinay project in this periodPinay escortThe power generation power is about 81.25MW (traffic side), and DC reverses to traffic. After the pressure is lifted to 35kV, it connects to the 35kV side of the newly built 110kV pressure lift station in this project with a 4-turn 35kV line.
Tender content and scope:
The project specifications The construction drawing design (including completion drawings), construction installation and trial construction of the photovoltaic site in the 3# block of Haixi Prefecture, Qinghai Province, all contents include but are not limited to the following: construction drawing design, completion drawing, equipment and data procurement and supply (except for supply A), equipment and data unloading and storage (including Supply A), photovoltaic field (including 35kV integrated circuits) and the civil engineering installation, construction, trial and inspection, full capacity of the entire station and stable network 240 hours of operation, defect elimination, functional test, photovoltaic system functional guarantee inspection, technology and after-sales service, and completed the completion of the inspection and acquisition of the light that has been exposed. The site area is handled continuously (quality inspection, network security review, professional health, power regulation and energy quality testing, all functions testing, etc.), and also includes the supply of spare parts (B type of equipment information), special items, consumables and related technical data, on-site construction and acceptance, column procurement and construction, and after the site handover <a For all coordination tasks of Manila escort, the bidder shall be responsible for all the tasks within the scope of the above tasks.ps://philippines-sugar.net/”>Escort.
Detailed bidding technical documents for specific bidding scope.
Project construction period:
The plan starts on August 15, 2021, 2Escort manilaThe jade department will be completed and powered online by December 30, 021. The specific daily start-up date will be based on the supervision and start-up order. Detailed bidding Sugar daddyTag document.
3. Investor qualification request
Basic qualification: The applicant must register for the People’s Republic of China (excluding the first Macau platform in Hong Kong). Ye Qiu locked his eyes, rubbed his sun, and watched several companies/companies on the stage chatting and having independent legal person qualifications; the applicant must have a safe production license (except for the design unit) and is within the useful period.
Quality request:
This bidding requestSugar babyThe bidder must have one of the following qualifications:
(1) Level 3 and above for general contracting of power engineering;
(2) Level B and above for power industry (new power generation).
Financial requestSugar daddy:
/
Same type of engineering experience (industry performance) request:
(With a monthly income of tens of thousands, do you have to learn more from her, do you know?” 1) Design performance request: /
(2) Similar performance request: /
FaithSugar babyRequest: /
Personnel request
(1) Project Manager: Have a registered certificate for a first-class construction engineer and the registered unit must have a different name from the bidder, and have the “Certificate of Passing the Safety Production Inspection” within the useful period.
(2) Ping An employee: has a useful period of built-in “Ping An Production Inspection and Qualification Certificate”.
Other requests
(1) This project does not accept joint bids.
(2) The bidder must pass ISO9000, ISO14000, OHSAS18000 series orPlan the certification of quality, environment, and safety systems.
4. Acquisition of bid documents
1. Acquisition time: The start time of obtaining bid documents: July 19, 2021 17:00; deadline: July 29, 2021 17:00
2. Acquisition method
(1) The bidder should register online on the China National Network Electronic Commerce Platform (https://ecp.cgnpc.com.cn) during the bidding document issuance and sale period. When registering, you must fill in the authorized bid contact information.
Pinay escort (2) If the bidder has registered as a member of the China Guangxi Core Electronics Platform, he or she can log in and register directly. Otherwise, she or she must first register as a member of the platform before she or she can register. Please refer to the China Guangxi Core Electronics Platform for details on the registration of a member. If the “Business License” information changes when the bidder registers, please log in to the China National Nuclear E-commerce Platform to change the new information about the member registration information. If the bidder fails to change the new data registration information in time and affects the bidder’s bid, the bidder shall assume his or her own responsibility.
(3) After the bidder wins the profit and registers, the bidder will authorize the bidder to download the electronic version of the bid documents online.
(4) The bidder must complete the relevant tasks of bid registration and downloading bid documents within the bidding document acquisition time, and the system will automatically close during the period. Tenders who fail to register and download bid documents in accordance with the above requests shall not participate in the bid. The bidder has the right to refuse to accept his bid documents. If they have been collected, they shall be processed as invalid bids.
5. Deadline for delivery of bid documents: August 9, 2021 09:00
Transfer method: This project adopts electronic bidding, and there is no need to submit paper bidding documents. For details on the submission method, please refer to the bidding documents Chapter 2 “Tenderers must know”.
6. Opening time and method
Opening time: Deadline time for the same bidding documents.
Tag opening method: Open online.
7.He notified the content of the report
Quality Review Method
This project adopts the post-qualification review method.
Preface to the issuance of notices
TC: